Solar Installation Guide

Solar panel installation

The notoriety of nearby planet group is expanding step by step. It is a wellspring of green and free power. All the while, it additionally lessens our power bill. Our organization likewise give Solar establishment guide. Presently on the off chance that you are remembering to introduce a nearby planet group for your home or business than you are clearly contemplating its establishment cycle. For your benefit, we partition the entire establishment process in three significant class.


Solar system pre-installation process

Solar system installation process

Solar system post-installation process


Solar system Pre-Installation Process

These are the means that you need to consider prior to introducing a nearby planet group. The means are notice underneath.


Step - I. Know Your Electricity Usage

This is the primary most advance in pre-establishment of a planetary group. With these subtleties you have and thought of Solar establishment guide. Here you want to ascertain your necessary power use. Gathering your old power bills are the least demanding method for computing the utilization. You can likewise compute it by joining your electrical apparatus' power consuming limit. 


Step II-Measure Your Roof Area

Measure your accessible rooftop space pointing toward the south, SW, and west. There are multiple ways of doing this, however the least demanding is simply to get an installer give you a free statement. You can likewise utilize google earth, or absolutely get out on your rooftop with estimating tape.


Step – III. Structural review

After calculating your load consumption you will have to choose a type of solar system. In solar PV system, there are three types of solar system.


On grid solar system :- With grid tie facility

Off grid solar system :- With battery backup facility

Hybrid solar system :- Both grid tie and backup 


Step - IV. Site visit and street planning by sun oriented specialists

In the wake of working out power utilization and picking the best nearby planet group type that fits you necessity, presently it's chance for site visit. For site visiting reason you can go for sun based master or likewise can reach us. In the wake of testing the establishment site, sun based specialists will finish the accompanying.


What number of sun powered chargers will be introduced?

Presently you know how much rooftop you have accessible for sun powered charger, Solar establishment guide and how large of a framework you really want. Presently you want to figure out what size boards you should cover your power use while remaining inside the space you have accessible.


Snatch a compass or look at google guides and figure what direction is south. Head outside, check out your rooftop and perceive how much rooftop space is pointing toward the south, southwest, east and west. The more south the better it is, however west is really alright.


Step - V. Settle the sun powered charger area (By Solar Expert)

This is the last advance of pre establishment process. This progression is trailed by sun powered specialists. In this progression, sun based specialists will choose:


The hole of sunlight based chargers from adjacent articles.

It is suggested that sunlight based chargers should be introduced two times from the tallness of item arranged close by. When you should actually take a look at it yourself.


Space between the two columns of sunlight powered charger.

It ought to be pre determined that the distance between two lines of sunlight based charger will be how a lot. So the shadow of first column couldn't cover another line's sunlight powered charger.


The best point to mount the sunlight based exhibit.

In India the introducing points may be change as indicated by geographical region. There are zones which characterize the establishment plots for sunlight based charger.


Zone - 1: Himachal Pradesh, J&K, Punjab, Uttarakhand - 30-360


Zone - 2: Rajasthan, Delhi, UP, Haryana, Bihar, North EASTERN STATES - 24-300


Zone - 3: Gujarat, MP, Jharkhand, West Bengal, Maharashtra, Chhattisgarh, Orissa - 18-240


Zone - 4: Karnataka, Tamil Nadu, AP, Telengana, Kerala - 12-180


Gear Needed for Installation

For introducing a planetary group, following hardware will be required. We prescribed you to get introduced by a sun based establishment organization.


Sr. No. Equipment

1. System assistance logbook

2. Datasheet and O&M manual

3. A hand drill or DC worked electric drill

4. Digital Voltmeter

5. Wrenches (Specific sizes) and All                         Mounting Bolts

6. Measuring tape (25m)

7. Screw Drivers: level Blade

8. Electrical Tape

9. DC patching iron

10 Hammer

11. Miscellaneous for associations: Split               screws  wire nuts, hauls, weld less                        connectors

12. Compass and Sun Pathfinder

13. Nut drivers 1/4in and 5/16in14

14. Tilt Angle marker, or plumb line and                       protractor

15. Wire Crimping, Stripping and Cutting Tool

16. Hacksaw

17. Safety goggles and Rubber gloves


Solar Panel system Installation Process

The establishment interaction is the fundamental essence of any establishment guide. For introducing a planetary group, you want to follow the means referenced underneath.


Step – I. Installation of mounting structure

To introduce the mounting structure is the primary and somewhat interesting sort of work. Sunlight based establishment guide is vital before introduce. The mounting construction might be different as indicated by introducing space. For roof establishment, railed, rail-less and ballasted mounting structure are utilized. For ground establishments, single shaft, multi post mounting structures are there. Right off the bat, the establishment has been arranged. There are numerous sort of establishments, contingent on your surface kind. After establishment, the design will be introduced. Different size nut-screws, creasing apparatuses, penetrating machines are utilized for this reason.


Step – II. Solar panel installation and parallel connections

Subsequent to introducing the mounting structure, presently its chance to introduce sunlight powered charger. For introducing sun powered exhibits we recommend you to recruit an accomplished installer. The PV modules will be introduced on mounting structure with the assistance of nut-screws, fastening, tie up links, and so on Our organization additionally give Solar establishment guide.


Subsequent to fixing all PV modules they will be associated together through equal associations. The boards will create more power on the off chance that they will be joined together.


Step - III. Battery Installation

The third step is to introduce the sun based battery. This battery will give you power reinforcement. While introducing sun oriented battery, following focuses ought to be remember.


Battery should be ideal in size or as per your necessary power reinforcement. Never use over or under size battery in a nearby planet group.

Introduce the sun based battery on dry and level surface.

Continuously introduce a marked sun based battery. If conceivable, stay away from nearby batteries.

While interfacing it with burden or inverter generally utilize great quality links.


Step - IV. Inverter Installation

Whenever you introduced sunlight powered charger and sun oriented battery, then, at that point, likewise introduce the sun based inverter. There are many sorts of sunlight based inverter. You ought to introduce a sunlight based inverter contrasting it and your prerequisites. While introducing a sun oriented inverter, follow the fundamental security steps.


Introduce it at a dry and very much ventilated spot.

Keep your sun oriented inverter close to sun based battery.

Make appropriate earthing at the hour of establishment.

Utilize quality links for associations.


Step – V. Electrical Connections/Wirings (With Load & Grid)

This is the last advance of establishment process. In this progression we will associate our electrical apparatuses and utility network with the planetary group. Associations ought to be finished by an expert. After the association will done than you can utilize the sunlight based ability to run your apparatuses.


Planetary group Post-Installation Steps

Post establishment steps are important to keep up with the productivity of a planetary group. Here we arranged the support cycle in three sections.


Weekly maintenance

Cleaning of sunlight powered charger

Cleaning of sunlight powered charger

The sunlight powered charger should be perfect on week by week premise. This will keep up with the effectiveness of the sun powered charger. For cleaning the sun powered chargers you can utilize the sun powered charger cleaning pa

Sunlight based battery should be kept an eye on month to month premise. Consistently you should check the electrolyte level in the battery (on the off chance that you introduced lead corrosive battery). Additionally check whether any new burden have been included existing limit.


Post a Comment

और नया पुराने